Customization: | Available |
---|---|
Application: | Machinery, Industry |
Function: | Change Drive Torque, Change Drive Direction, Speed Changing |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
NMRV Series Worm Gear Motor contains worm gear reducer and motor(Including three phrese AC motor,single AC motor,DC servo motor and DC PM motor).The square aluminum gearbox is manufactured based on GB1055588 cylindrical gear parameter.During the process, many advanced technologies are adopted.So it has compact structure, good appearance and excellent heatsink when runing.
This series motor has the following characteristics:smooth running, low noise, large transmission ratio and strange loadcapacity and it may match with different kinds of motors for realizing speed adjustment.
Type: | Aluminium Worm reducer |
Model: | Center Distance:25,30,40,50,63,75,90,110,130 |
Ratio: | 5,7.5,10,15,20,25,30,40,50,60,80,100 |
Color: | Blue/Silver White |
Material: | Aluminium Alloy |
Worm Gear- Cooper-10-3 | |
Worm-20CrMnTi with carburizing and quenching, surface hardness is 56-62HRC | |
Shaft-chromium steel-45 | |
Packing: | Carton box/per set(With foam board inside) |
Bearing: | high quality Bearing |
Seal: | high quality seals |
Warranty: | 1 year |
Input Power: | 0.1kw,0.55kw,0.75kw,1.1kw,1.5kw,2.2kw,4kw,5.5kw,7.5kw |
Usages: |
In industrial machine: widely used in packing, printing,textile machine,as well as woodworking,glass and plastics,food stuff,ceramics,chemical,etc. |
IEC Flange: | B5,B14 |
Lubricant: | Synthetic & Mineral |
Maintance:
1:After 300-hours operation, please change the oil, and flush the gear uint with suitable detergents.
2: Please do not mix the mineral oil and synthetic oil.
3.No more than 4000m above sea level.
4.Ambient temperature:-25~40degree.
5.Relative humidity ≤95%(at +25degree).
6.The followed temperature rise: no more than 75K(when 1000m above sea level)degree
Packing & Delivery:
Inner Packing: PP bag with carton;
Outer Packing: Wooden case;
Shipment: 20-30 days upon receiving the deposit.