Customization: | Available |
---|---|
Standard Or Nonstandard: | Standard |
Shaft Hole: | 19-32 |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1. Installation:
The expansion sleeve is greased at the factory and can be installed directly. When installing, first screw three bolts 4 into the screw holes of the flange of the other part 1 and spread them evenly around the circumference to open the inner sleeve 1 and the outer sleeve
2. Then place the expansion sleeve into the hub hole of the design position and tighten the bolt with the force gauge. The method of tightening is to screw each bolt to 1/4 of the rated torque at a time. The order of tightening is bounded by the slit. The left and right cross symmetry is tightened one after the other to ensure that the rated torque value is reached.
2. Disassembly:
Loosen all bolts a few turns before disassembly. Then screw in the bolt 4 top loose sleeve in the disassembled screw hole.
3. Protection:
MoS2 oil is strictly prohibited during installation to prevent contamination of the expansion sleeve. On machines with poor open air or working environment, rust-proof grease should be applied regularly on the exposed end face and bolts of the expansion sleeve. The expansion sleeve type with better rust resistance should be selected.
Product Parameters:
Features:
1. Easy to install and disassemble;
2. Good exchangeability;
3. Long lifetime and high efficient transmitting;
4. While running under overload, it can protect the equipment from breakdown.
Packing & Shipping:
1. Prevent from damage.
2. As customers' requirements, in perfect condition.
3. Delivery: As per contract delivery on time.
4. Shipping: As per client request. We can accept CIF, Door to Door etc. or client authorized agent we supply all the necessary assistant.